Service installation over 2" shall be charged at the rate
for materials, labor and appropriate overhead.


FIRE HYDRANT HOOKUP

There is no charge for a fire hydrant hookup provided the District has no material or contractor labor expense.  The hydrant, valve, line and all appurtenances must be deeded to the District along with proof of the cost of material.
If you need us to sign off on your building permit and you will be needing a new hookup, then you will be expected to pay when we sign off.
Each unit with Avondale Irrigation District served water, whether a single unit or part of a duplex, triplex or other multi-unit, or whether residential, commercial or industrial, shall have its own tap and connection.  The following are the hookup fees for the Avondale Irrigation District.

Costs to upsize your meter will be the difference of cost from the orginal hookup fee to the new hookup fee, and a $100.00 per hour charge for labor, which may be waived by the district. 

5/8" x 3/4"
1"
1 1/2"
2"
4"
6"
8"
$2,700.00
$3,000.00
$3,700.00
$4,300.00
$5,700.00
$7,700.00
$9,700.00
FIRE LINE HOOKUP
Copyright © Avondale Irrigation District 2012, All Rights Reserved
$1,200.00
$1,500.00
$2,800.00
$3,000.00
TBD
TBD
TBD
+
+
+
+
+
+
+
Size                          Hookup              Material Cost